Africa's largest hydropower project — Orchid Business Group delivered Saddle Dam excavation, mass earthworks and 114 km of access roads deep in the Benishangul-Gumuz highlands.
The Grand Ethiopian Renaissance Dam (GERD) on the Blue Nile at Guba, Benishangul-Gumuz, will be Africa's largest hydropower plant at 6,450 MW — transforming Ethiopia from a power-deficit nation into a regional electricity exporter.
Orchid Business Group was engaged as a sub-contractor to Salini Impregilo (now WeBuild), the Italian engineering giant appointed by the Ethiopian Electric Power Corporation (EEP) as the principal contractor. Our scope spanned the two most critical enabling works on the dam site: the Saddle Dam excavation and the construction of three major access road corridors linking the dam footprint to regional arteries.
Operating in the remote gorges of Benishangul-Gumuz, our teams worked through the region's extreme seasonal flooding, inaccessible terrain and logistical challenges that demanded a self-sufficient, high-capacity site establishment. Over five years on site, Orchid deployed a continuous fleet of heavy earthworks plant, operated around the clock during the dry season windows.
"The GERD is not just Ethiopia's dam — it is Africa's dam. The civil enabling works that companies like Orchid delivered made the construction of the main structure possible."
— Ethiopian Electric Power Corporation
Each package was awarded separately and ran concurrently at peak mobilisation, demanding simultaneous coordination across remote work fronts spread over 114 km of new terrain.
The Saddle Dam required complete geological excavation to bedrock across a wide saddle between two ridges. Orchid executed the bulk earthworks package — stripping overburden, excavating competent rock and managing spoil disposal to approved dumps within the dam reservation zone.
The longest of the three road packages, Road 3 created the primary logistics artery connecting the town of Guba to the dam construction plateau. The route traversed steep gorge terrain requiring deep cut-and-fill earthworks and multiple drainage structures.
Road 4 connected the dam construction plateau to the permanent workers' camp zone, carrying the daily movement of thousands of site workers and all camp supply logistics. Despite its shorter length, the road required the highest construction standard due to its frequency of use.
The most challenging road package, Road 6 pushed through 67 km of previously un-roaded wilderness to create access from Abujedaho to the dam site. The route crossed multiple seasonal rivers and demanded significant bridge and culvert infrastructure alongside the road formation.
No pre-existing roads, power or communications infrastructure. Every input had to be self-mobilised through several hundred kilometres of rough track from the nearest town.
The Blue Nile gorge receives intense monsoon rains that flood working areas and isolate the site for months. All earthmoving had to be completed in compressed dry-season windows.
The Saddle Dam excavation required precision rock breaking in proximity to the dam's grout curtain zone, with zero tolerance for blast vibration damage to the core foundation.
Sustained presence of specialist operators, maintenance teams and supply logistics across 114 km of newly-built roads — many of which did not exist until Orchid built them.
Orchid established a permanent forward operating base with workshops, fuel storage, accommodation and communications — enabling complete operational independence from the main contractor camp.
All earthworks schedules were phased against the Blue Nile flood calendar. Peak excavation and compaction outputs were front-loaded into the October–April dry season, maximising annual throughput.
A dedicated in-field workshop with full spare parts inventory ensured near-zero downtime across all excavators, dozers, graders, compactors and haul trucks deployed on the project.
Five years of 24-hour operations in a high-hazard environment, with a safety culture aligned to Salini Impregilo's international standards — delivering the full scope without a lost-time incident.
Orchid deployed a complete heavy earthworks fleet from its own owned asset base — no sub-hire, no dependency on third-party equipment.
Volvo & Komatsu 20–50 t hydraulic excavators for cut, bench and spoil loading operations
CAT D6–D9 class dozers for pioneer track-opening and mass push operations
30–40 t ADTs operating on internal haul loops between excavation faces and spoil dumps
Continuous grading and shaping of 114 km of road formation and gravel running surface
Vibratory rollers and compactors achieving specified density standards on road and dam formation
Fleet of bowsers providing dust suppression and optimum moisture for compaction on all road works
Autonomous power generation providing 24-hour workshop, lighting and communications capability
Fully-equipped field workshop with hydraulic test benches, spare parts and resident mechanics
Site establishment, pioneer track cutting, fuel depot and workshop mobilisation. Commencement of Road 3 pioneer formation.
Full formation, earthworks and gravel surfacing of Road 3 (40.6 km) to Guba and Road 4 (6.3 km) to Permanent Camp. Saddle Dam excavation scoping completed.
Mass excavation of Saddle Dam footprint commences. Rock breaking and controlled blasting for deep cut. Road 6 pioneer track opened toward Abujedaho.
Maximum fleet deployment across all four work packages simultaneously. Saddle Dam excavation at full throughput. Road 6 formation advancing through gorge terrain.
All 67 km of Road 6 to Abujedaho completed and handed over. Saddle Dam excavation scope achieved to design levels. Snag rectifications and final inspections.
All scopes completed and signed off. Full equipment demobilisation to Addis Ababa. Certificate of completion issued by Salini Impregilo. Project formally closed.
State-owned power utility and project owner. EEP is responsible for the generation, transmission and supply of electricity across Ethiopia.
Project Owner & EmployerItalian engineering giant and one of the world's leading dam builders. Appointed as principal contractor for GERD under an EPC contract with EEP.
Main Contractor — OBG's PrincipalEthiopia's specialist infrastructure and earthworks contractor, engaged for mass excavation at the Saddle Dam and construction of three access road corridors.
Sub-Contractor — Earthworks & RoadsFrom feasibility through final handover — Orchid Business Group brings the machines, the manpower and the mastery.