Infrastructure Sub-Contract Completed

Grand Ethiopian Renaissance Dam Civil Works

Africa's largest hydropower project — Orchid Business Group delivered Saddle Dam excavation, mass earthworks and 114 km of access roads deep in the Benishangul-Gumuz highlands.

0 m³ Earthworks
0 Access Roads
0 On Site
0 Dam Capacity
Project Overview

Building the arteries of Africa's most ambitious dam

The Grand Ethiopian Renaissance Dam (GERD) on the Blue Nile at Guba, Benishangul-Gumuz, will be Africa's largest hydropower plant at 6,450 MW — transforming Ethiopia from a power-deficit nation into a regional electricity exporter.

Orchid Business Group was engaged as a sub-contractor to Salini Impregilo (now WeBuild), the Italian engineering giant appointed by the Ethiopian Electric Power Corporation (EEP) as the principal contractor. Our scope spanned the two most critical enabling works on the dam site: the Saddle Dam excavation and the construction of three major access road corridors linking the dam footprint to regional arteries.

Operating in the remote gorges of Benishangul-Gumuz, our teams worked through the region's extreme seasonal flooding, inaccessible terrain and logistical challenges that demanded a self-sufficient, high-capacity site establishment. Over five years on site, Orchid deployed a continuous fleet of heavy earthworks plant, operated around the clock during the dry season windows.

"The GERD is not just Ethiopia's dam — it is Africa's dam. The civil enabling works that companies like Orchid delivered made the construction of the main structure possible."
— Ethiopian Electric Power Corporation
Scope of Work

Four work packages. One national mission.

Each package was awarded separately and ran concurrently at peak mobilisation, demanding simultaneous coordination across remote work fronts spread over 114 km of new terrain.

Saddle Dam mass excavation at GERD
01

Saddle Dam — Mass Excavation

The Saddle Dam required complete geological excavation to bedrock across a wide saddle between two ridges. Orchid executed the bulk earthworks package — stripping overburden, excavating competent rock and managing spoil disposal to approved dumps within the dam reservation zone.

  • 5+ million m³ total excavation volume
  • Rock breaking & controlled blasting
  • Spoil management to engineered dumps
  • Dewatering and seasonal flood management
  • 24-hour shift operations during dry season
Road 3 to Guba — access road earthworks at GERD
02

Road 3 — Guba Access (40.6 km)

The longest of the three road packages, Road 3 created the primary logistics artery connecting the town of Guba to the dam construction plateau. The route traversed steep gorge terrain requiring deep cut-and-fill earthworks and multiple drainage structures.

  • 40.6 km formation and gravel surfacing
  • Cut-and-fill through gorge terrain
  • Multiple culverts & drift crossings
  • Designed for 50-tonne oversize loads
Road 4 to Permanent Camp — GERD construction
03

Road 4 — Permanent Camp (6.3 km)

Road 4 connected the dam construction plateau to the permanent workers' camp zone, carrying the daily movement of thousands of site workers and all camp supply logistics. Despite its shorter length, the road required the highest construction standard due to its frequency of use.

  • 6.3 km high-frequency camp access road
  • Engineered to handle 3,000+ workers/day
  • Gravel surfacing with dust suppression
  • Roadside drainage & erosion protection
Road 6 — Abujedaho route through Benishangul-Gumuz wilderness
04

Road 6 — Abujedaho Route (67 km)

The most challenging road package, Road 6 pushed through 67 km of previously un-roaded wilderness to create access from Abujedaho to the dam site. The route crossed multiple seasonal rivers and demanded significant bridge and culvert infrastructure alongside the road formation.

  • 67 km through un-roaded wilderness
  • Multiple seasonal river crossings
  • Bridge abutments & culvert installation
  • Remotest of the three road packages
The Challenge

Operating at the edge of the known world

Extreme Remoteness

No pre-existing roads, power or communications infrastructure. Every input had to be self-mobilised through several hundred kilometres of rough track from the nearest town.

Severe Seasonality

The Blue Nile gorge receives intense monsoon rains that flood working areas and isolate the site for months. All earthmoving had to be completed in compressed dry-season windows.

Technical Complexity

The Saddle Dam excavation required precision rock breaking in proximity to the dam's grout curtain zone, with zero tolerance for blast vibration damage to the core foundation.

Workforce & Supply Chain

Sustained presence of specialist operators, maintenance teams and supply logistics across 114 km of newly-built roads — many of which did not exist until Orchid built them.

Our Approach

A phased mobilisation built for endurance

Self-Sufficient Site Establishment

Orchid established a permanent forward operating base with workshops, fuel storage, accommodation and communications — enabling complete operational independence from the main contractor camp.

Seasonal Production Planning

All earthworks schedules were phased against the Blue Nile flood calendar. Peak excavation and compaction outputs were front-loaded into the October–April dry season, maximising annual throughput.

Fleet Redundancy & Workshop Support

A dedicated in-field workshop with full spare parts inventory ensured near-zero downtime across all excavators, dozers, graders, compactors and haul trucks deployed on the project.

Zero Harm Safety Culture

Five years of 24-hour operations in a high-hazard environment, with a safety culture aligned to Salini Impregilo's international standards — delivering the full scope without a lost-time incident.

Resources Deployed

The machines that moved a mountain

Orchid deployed a complete heavy earthworks fleet from its own owned asset base — no sub-hire, no dependency on third-party equipment.

Excavators

Volvo & Komatsu 20–50 t hydraulic excavators for cut, bench and spoil loading operations

Bulldozers

CAT D6–D9 class dozers for pioneer track-opening and mass push operations

Articulated Haul Trucks

30–40 t ADTs operating on internal haul loops between excavation faces and spoil dumps

Motor Graders

Continuous grading and shaping of 114 km of road formation and gravel running surface

Compaction Plant

Vibratory rollers and compactors achieving specified density standards on road and dam formation

Water Bowsers

Fleet of bowsers providing dust suppression and optimum moisture for compaction on all road works

Generator Sets

Autonomous power generation providing 24-hour workshop, lighting and communications capability

Mobile Workshop

Fully-equipped field workshop with hydraulic test benches, spare parts and resident mechanics

Orchid heavy earthworks fleet at GERD site
Orchid's fleet continuously active across all four work packages
Project Timeline

Five years from mobilisation to demob

2017

Mobilisation & Pioneering

Site establishment, pioneer track cutting, fuel depot and workshop mobilisation. Commencement of Road 3 pioneer formation.

2018

Road 3 & Road 4 Construction

Full formation, earthworks and gravel surfacing of Road 3 (40.6 km) to Guba and Road 4 (6.3 km) to Permanent Camp. Saddle Dam excavation scoping completed.

2019

Saddle Dam Excavation Begins

Mass excavation of Saddle Dam footprint commences. Rock breaking and controlled blasting for deep cut. Road 6 pioneer track opened toward Abujedaho.

2020

Peak Production

Maximum fleet deployment across all four work packages simultaneously. Saddle Dam excavation at full throughput. Road 6 formation advancing through gorge terrain.

2021

Road 6 Completion & Saddle Dam Handover

All 67 km of Road 6 to Abujedaho completed and handed over. Saddle Dam excavation scope achieved to design levels. Snag rectifications and final inspections.

2022

Demobilisation & Project Close

All scopes completed and signed off. Full equipment demobilisation to Addis Ababa. Certificate of completion issued by Salini Impregilo. Project formally closed.

Client & Partners

Working alongside the world's best

Ethiopian Electric Power (EEP)

State-owned power utility and project owner. EEP is responsible for the generation, transmission and supply of electricity across Ethiopia.

Project Owner & Employer

Salini Impregilo S.p.A. (WeBuild)

Italian engineering giant and one of the world's leading dam builders. Appointed as principal contractor for GERD under an EPC contract with EEP.

Main Contractor — OBG's Principal

Orchid Business Group PLC

Ethiopia's specialist infrastructure and earthworks contractor, engaged for mass excavation at the Saddle Dam and construction of three access road corridors.

Sub-Contractor — Earthworks & Roads
Have a project in mind?

Let's build something
remarkable together.

From feasibility through final handover — Orchid Business Group brings the machines, the manpower and the mastery.

Chat with us!