Project Overview
The most demanding heavy haulage corridor in East Africa
Africa's largest dam could not be built without its machinery — turbine generators, transformer units, gantry cranes and specialist construction plant, much of it manufactured in Europe or China and arriving at Djibouti port too large and too heavy for any standard trucking company.
Salini Impregilo engaged Orchid Logistics to move this equipment from Djibouti Port to the GERD construction site — a 750+ km route including Addis Ababa's city ring road, mountain passes through the Blue Nile gorge escarpments, and the final switchback descent to the Guba plateau. Loads exceeding 60 tonnes required bridge structural assessments, municipal clearances and police escort coordination across three regional administrations.
Over five years — matching the duration of Orchid's civil works sub-contract at GERD — the logistics division ran repeated convoys carrying progressively larger equipment. The largest single movement, a power transformer exceeding 120 tonnes, required multi-axle Goldhofer trailer configuration, a 20-vehicle escort convoy and a night movement through Addis Ababa.
"Moving a 120-tonne transformer through Addis Ababa at 2am and then up a mountain switchback at walking pace — that is what Orchid Logistics was built for."
— OBG Logistics Division Director