Large-diameter steel conductor casing installation for oil exploration wellheads in South Omo Zone — Orchid's first oil and gas piling project, requiring remote mobilisation and conductor installation to API oil industry standards.
South Omo Zone in southern Ethiopia sits on one of Africa's most prospective frontier oil basins. Tullow Oil plc engaged Orchid Business Group to install the conductor casing piles at each wellhead location — the first structural element of any oil exploration well.
This was Orchid's first oil industry project, requiring adoption of API (American Petroleum Institute) well construction standards alongside Tullow's own procedures — a significant step up in documentation and quality management from standard civil construction. Operating 700+ km from Addis Ababa in remote semi-arid terrain, with no local construction supply or infrastructure, Orchid deployed as a fully integrated group — Pile Foundation for the technical scope, Remote Field Services for the forward operating base, and Logistics for the supply corridor.
"The oil industry's well construction standards are among the most rigorous in any sector. Tullow's selection of Orchid for conductor casing work in South Omo was a vote of confidence in our technical and quality capability."
— OBG Pile Foundation Division
The oil industry's API well construction standards exceed Ethiopian building code in every respect — documentation, tolerances, material certification and inspection. Orchid had no prior experience with API before this project.
South Omo is home to indigenous pastoral communities with distinct land rights and cultural sensitivities — requiring a community engagement plan approved by Tullow Oil.
700+ km from Addis Ababa with no local construction supply, no fuel distribution, and limited communications — demanding complete operational self-sufficiency.
Orchid's site team completed API well construction training before mobilisation — with a Tullow Oil engineer embedded for the first two conductor installations to verify correct standards application.
A dedicated community liaison officer — speaking local Mursi and Ari languages — managed the daily relationship with communities at each well location throughout the programme.
Orchid's Logistics division managed the supply convoy from Addis. Remote Field established the camp. Pile Foundation delivered the technical scope — a fully integrated group deployment.
Contract award by Tullow Oil. Orchid team completes API well construction training. Community liaison officer appointed. Remote camp established at South Omo exploration area.
Systematic conductor casing installation at all Tullow Oil wellhead locations. Tullow well construction engineer embedded for first two conductors. Full API documentation maintained throughout.
All conductors installed and accepted by Tullow Oil. QC documentation package issued. Camp demobilised and site restored. OBG's first oil industry project formally closed.
UK-listed independent exploration and production company, one of Africa's leading oil explorers — with major discoveries in Ghana, Kenya and Uganda, and an active exploration programme in Ethiopia's South Omo Block.
ClientEthiopia's specialist contractor for conductor casing installation, remote camp establishment and logistics support throughout the South Omo conductor casing programme.
Contractor — Conductor Casing & Remote FieldFrom feasibility through final handover — Orchid Business Group brings the machines, the manpower and the mastery.