Pile Foundation Geothermal Energy Completed

Melka Sedi Geothermal Plant Foundation Works

Specialist pile foundation works in the volcanic terrain of the Afar Rift — the most geologically demanding environment Orchid has ever drilled, with active hydrothermal activity and corrosive ground conditions.

0 Pile Depth
Afar Rift Location
GDC Ethiopia Client
2022 Completed
Project Overview

Foundation engineering in Ethiopia's most geologically active terrain

The Afar Rift is one of the most geologically active places on Earth — a volcanic landscape where tectonic plates are actively splitting, producing the hydrothermal fields that make the region one of Africa's most promising geothermal energy sources.

GDC Ethiopia engaged Orchid to deliver pile foundation works for the Melka Sedi plant structures. The Afar Rift's volcanic geology presented conditions unlike any previous Orchid project: basaltic rock of variable hardness interspersed with hydrothermal alteration zones, high ground temperatures and chemically aggressive groundwater requiring specialised casing and concrete mix design.

Beyond the geological complexity, Melka Sedi required Orchid to run an integrated remote field camp — with our Remote Field Services division establishing the base while the Pile Foundation division delivered the technical scope. This integration demonstrated the group-wide capability that makes Orchid unique.

"Drilling in the Afar Rift is unlike any other ground condition — you're working in an active volcanic environment where geology changes every few metres. Orchid's Bauer operators adapted and delivered."
— GDC Ethiopia Project Engineer
Scope of Work

Two integrated divisions. One seamless delivery.

Pile Foundation and Remote Field Services working together to deliver a technically complex scope in one of Africa's most extreme environments.

Volcanic terrain foundation piling at Melka Sedi geothermal plant
01

Volcanic Terrain Foundation Piling

Bored cast-in-situ piles for geothermal plant structures drilled through alternating basalt, hydrothermal alteration zones and harder unweathered rock — requiring the full range of Bauer drilling tools and continuous adaptation at the pile face.

  • Volcanic basalt & alteration zones
  • Adaptive drilling technique
  • Sulphate-resistant concrete mix
  • Corrosion-protected casing
Integrated remote site operations at Melka Sedi
02

Integrated Remote Site Operations

Orchid's Remote Field Services division established and ran the Melka Sedi camp while Pile Foundation delivered the technical scope — a seamless integrated deployment eliminating coordination risk between separate contractors.

  • Integrated remote camp
  • Solar & generator power
  • Camp water supply
  • 24/7 operational support
The Scale

Numbers from the Afar Rift

Afar
Rift
Ethiopia's most extreme terrain
0
Max pile depth
2
divisions
OBG divisions integrated
2022
Year completed
The Challenge

Drilling in an active volcanic hydrothermal environment

Hydrothermal Alteration

Zones of hydrothermally altered rock between basaltic horizons are unpredictably soft, chemically aggressive and prone to borehole collapse — requiring the driller to recognise and respond instantly to changing conditions at the face.

Acidic Groundwater

Groundwater in hydrothermal zones can be chemically aggressive toward standard pile concrete and steel casing — requiring sulphate-resistant concrete (Class 4) and corrosion-protected casing throughout.

Remote Afar Operations

Melka Sedi is remote, off-grid and without public services — requiring Orchid to provide all utilities, accommodation and emergency response from its own resources.

Our Approach

Geological expertise, material adaptation and integrated camp operations

Variable Tool Deployment

Bauer rig equipped with rotary bucket, core barrel and DTH hammer — switched at the pile face as conditions changed. Driller's log recorded transition depths for geotechnical record.

Sulphate-Resistant Mix

Concrete mix agreed with structural engineer for Class 4 sulphate resistance — protecting pile integrity against aggressive Afar groundwater throughout the design life.

Orchid Remote Field Integration

Remote Field Services established and ran the camp while Pile Foundation delivered the technical scope — a fully integrated deployment with single-point accountability.

Resources Deployed

Equipped for Earth's most extreme geology

Purpose-selected equipment for volcanic terrain — from Bauer drilling tools to a full off-grid camp infrastructure operated by Orchid Remote Field Services.

Bauer BG-Series Rig

Full drilling tool suite (auger, core barrel, DTH hammer) deployed for volcanic ground

Temporary Casing

Corrosion-protected temporary casing for aggressive hydrothermal groundwater zones

Remote Camp Infrastructure

Generator, water treatment, satellite communications — all from Orchid Remote Field division

Sulphate-Resistant Concrete

Class 4 SR concrete mix designed for Afar geochemistry

Survey Total Station

Pile position and head level surveyed to structural tolerance after each pour

Generator Sets

Autonomous power for rig hydraulics, lighting and camp operations off-grid

Water Treatment

Portable RO plant treating Afar groundwater to drilling and camp supply quality

Mobile Workshop

Field workshop with spare parts inventory for zero-downtime rig operations in remote terrain

Bauer rig and remote camp — fully integrated OBG deployment at Melka Sedi
Bauer rig and remote camp — fully integrated OBG deployment at Melka Sedi
Project Timeline

From camp establishment to pile completion

2020

Remote Camp Establishment & Site Mobilisation

Orchid Remote Field division established the Melka Sedi camp. Rig transport to Afar. Initial site assessment and geological review of the pile formation zone.

2021

Full Pile Installation Programme

Full pile installation programme underway. Geology adaptation protocols deployed. Concurrent camp operations maintained by Remote Field division throughout.

2022

Pile Completion, Testing & Demobilisation

Pile completion and integrity testing completed to structural engineer sign-off. Full demobilisation of rig and camp. Project formally closed.

Bauer rig — Afar volcanic terrain
Bauer rig — Afar volcanic terrain
Geothermal Energy

Ethiopia's renewable future from the Afar Rift

The Afar Rift holds some of Africa's greatest geothermal potential — heat from active volcanism that can generate reliable baseload electricity for decades. Orchid's foundations support the plant beginning to unlock that potential.

Casing in hydrothermal zone
Casing in hydrothermal zone
Remote camp — Afar support base
Remote camp — Afar support base
Afar Rift Valley

Earth's most active geological rift — and the site of Orchid's most technically demanding foundation piling project.

Geothermal plant foundation works
Geothermal plant foundation works
Client & Partners

Delivering for Ethiopia's energy future

GDC Ethiopia

The Geothermal Development Company (GDC) Ethiopia is the government body responsible for developing Ethiopia's geothermal energy resources — one of the largest untapped geothermal reserves in Africa.

Client

Orchid Business Group PLC

Ethiopia's specialist pile foundation and remote field services contractor — delivering the integrated piling and camp scope at Melka Sedi through two group divisions operating as one team.

Orchid Business Group PLC — Piling & Remote Field
Have a project in mind?

Let's build something
remarkable together.

From feasibility through final handover — Orchid Business Group brings the machines, the manpower and the mastery.

Chat with us!