Project Overview
Laying the earthworks foundation for Ethiopia's national railway backbone
The Awash–Weldiya railway is part of Ethiopia's ambitious national rail programme — a standard-gauge network connecting Addis Ababa through the Afar lowlands and up into the Amhara highlands toward Weldiya. The 400 km+ route was divided into multiple sections awarded to different contractors.
Yapi Merkezi of Turkey was appointed as main contractor for a significant section of the Awash–Weldiya corridor. Orchid Business Group was engaged as earthworks sub-contractor responsible for 50 km of track-bed formation — involving mass excavation in cuttings, embankment construction in fill sections and precision formation grading to railway tolerances of ±20 mm across the full formation width.
Railway earthworks are held to considerably tighter tolerances than road earthworks — both in terms of formation level and cross-fall — because the long-term performance of the track depends on a stable, uniform sub-grade. Over three years on site, Orchid's teams operated in the contrasting terrain of the Afar lowlands and the Amhara escarpment, managing the project's two most demanding geographic transitions.
"The precision required for railway track-bed formation is an order of magnitude above standard road earthworks. Yapi Merkezi's appointment of Orchid reflected confidence in our ability to deliver to those standards consistently across 50 km of varied terrain."
— OBG Project Manager