Project Overview
Water for the railway that connected Ethiopia's north
The Awash–Weldiya railway construction programme employed tens of thousands of workers spread across 500 km of corridor. Every worker camp, every concrete batching plant and every dust suppression operation required reliable water supply — none of the existing rural infrastructure could support a national construction programme.
Yapi Merkezi engaged Orchid to drill 28 water supply boreholes distributed along the railway corridor — the largest single water well programme Orchid had executed. Three Prakla rigs operated simultaneously at different locations, with a central drilling management team co-ordinating hydrogeological survey, borehole placement and well development across the full 500 km.
Many boreholes were positioned for dual purpose — serving the construction programme during the build period and then transferring to local community water supply after completion, providing a lasting water infrastructure legacy in some of Ethiopia's most water-stressed communities.
"Twenty-eight boreholes across 500 km of railway corridor required three rigs, a hydrogeological strategy and the logistics of a small construction company operating simultaneously at a dozen different sites."
— OBG Water Well Division