Water Well Industrial Supply Completed

Shimela & Kilinto Industrial Water Wells

High-yield production boreholes for industrial parks on the eastern outskirts of Addis Ababa — providing the reliable groundwater supply that Ethiopia's manufacturing sector depends on.

Addis Ababa Outskirts Location
Industrial Supply Category
72h Pump Test Standard
Completed Status
Project Overview

Water supply for Ethiopia's industrial future

Shimela and Kilinto, on the eastern fringe of Addis Ababa, are home to major industrial park developments — part of Ethiopia's strategy to attract foreign direct investment in manufacturing. Reliable, high-yield water supply is a fundamental requirement for industrial tenants in garment, food processing and light manufacturing.

Orchid Business Group was engaged to drill production boreholes at both sites — targeting aquifers capable of supplying the consistent daily volumes required by industrial operations. Unlike community supply wells, industrial boreholes must demonstrate assured yield under sustained pumping — requiring a 72-hour pump testing programme proving round-the-clock operational reliability.

Working on the peri-urban fringe of Addis Ababa presented different challenges from Orchid's remote drilling programmes — presence of urban infrastructure, coordination with existing supply networks, and the requirement to meet industrial park developer specifications beyond standard WASH borehole standards.

"Industrial water supply requires consistent yield, water quality suitable for industrial processes and pumping system reliability for 24/7 operations. Orchid delivered all three."
— Industrial Park Development Corporation
Scope of Work

High-yield production boreholes for Ethiopia's industrial parks.

Production borehole drilling and pump system installation at Shimela and Kilinto — proven to industrial-grade yield standards with 72-hour continuous pump testing.

High-yield production borehole drilling — Shimela and Kilinto industrial parks
01

High-Yield Production Boreholes

Rotary borehole drilling at Shimela and Kilinto targeting aquifer zones capable of sustained industrial supply yields — with 72-hour pump testing proving operational reliability for the industrial parks' round-the-clock water demand.

  • Production borehole drilling
  • 10–50 m³/hr target yields
  • 72-hour continuous pump test
  • Industrial water quality analysis
Pump system installation and commissioning — Kilinto industrial borehole
02

Pump System Installation & Commissioning

Submersible pump selection, installation and commissioning — sized to operational demand, with automated control panel, rising main and surface pipework connected to the park water distribution system.

  • Submersible pump sizing
  • Automated pump control
  • Rising main & surface pipework
  • Connection to park distribution
The Scale

Industrial-grade water supply for Addis Ababa's manufacturing east

Shimela
Eastern Addis Ababa
Industrial park site 1
Kilinto
Industrial park location
Eastern Addis Ababa site 2
72
h test
Hours — pump test duration
Continuous yield verification
2021
Year completed
Full project handover
The Challenge

Industrial-grade yield and quality in peri-urban geology

Yield Demand

Industrial parks require much higher daily yields than community supply — sustained operation at 10–50 m³/hr for 24 hours demands careful aquifer identification and borehole design.

Peri-Urban Hazard

Shimela and Kilinto have legacy infrastructure, old septic tanks and industrial waste that could affect groundwater quality — requiring careful hydrogeological assessment before siting any production borehole.

Developer Specifications

Industrial park developers apply their own technical specifications for water supply — more detailed than government standards, requiring Orchid to work within a more demanding framework.

Our Approach

Pre-siting investigation, proven yield testing and quality assurance

Hydrogeological Pre-Assessment

Desk study of existing borehole data combined with site-specific geophysical sounding identified optimal aquifer zones at each site — minimising dry-hole risk and pre-confirming target yields.

Extended Pump Testing

72-hour continuous pump test (rather than standard 24-hour) to prove sustained yield stability — the industrial developer's assurance of 24/7 supply reliability.

Water Quality Programme

Comprehensive analysis to WHO drinking water standards plus industrial process parameter testing — confirming suitability for both human consumption and industrial processes.

Resources Deployed

Purpose-specified for industrial production boreholes

Orchid's own drilling and pump system fleet — configured to industrial park developer specification from pre-siting survey through final pump commissioning.

Prakla RB-series rig

Prakla rotary rig — mud rotary configuration for the peri-urban geology at Shimela and Kilinto

Mud rotary system

Mud rotary drilling with bentonite fluid — maintaining borehole stability in the variable peri-urban geology

High-yield submersible pump

Grundfos high-yield submersible pump sets — sized at 10–50 m³/hr to meet industrial park operational demand

Automated pump control panel

Automatic pump control with level sensor, protection relays and remote monitoring — enabling unmanned 24/7 operation

Rising main & surface pipework

uPVC rising main, surface header pipework and connection to industrial park water distribution mains

Water quality lab kit

Field and laboratory water quality analysis — WHO drinking water parameters plus industrial process parameters

Data logger

Electronic data logger recording groundwater level and flow rate throughout the 72-hour pump test — producing the certified yield record

GPS survey

GPS-referenced borehole location record — integrated with the industrial park site drawings and asset register

Prakla rig and pump test equipment — Kilinto industrial borehole programme
Prakla rig and pump test equipment — Kilinto industrial borehole programme
Project Timeline

From site investigation to industrial park handover

2019

Site Investigation & Pre-Siting Assessment

Desk study of existing borehole data, geophysical sounding and hydrogeological pre-assessment at both Shimela and Kilinto sites. Optimal aquifer zones and borehole locations confirmed with industrial park developer.

2020

Drilling Programme — Shimela & Kilinto

Production borehole drilling at both sites — mud rotary method through the peri-urban Addis Ababa geology. Casing installation and preliminary well development at all boreholes.

2021

Pump Tests, Quality Sampling & System Commissioning

72-hour continuous pump tests at all production boreholes — yield certification records issued. Water quality sampling and analysis completed. Submersible pump installation, automated control panel commissioning and connection to park distribution network. Final handover to industrial park clients.

Production borehole drilling — Shimela
Production borehole drilling — Shimela
Industrial Ethiopia

Water supply for Ethiopia's manufacturing ambition

Shimela and Kilinto industrial parks host garment factories, food processors and light industry employing tens of thousands of Ethiopians. Reliable water is the foundation of that industrial ambition — and Orchid's production boreholes deliver it.

Completed production borehole — Kilinto
Completed production borehole — Kilinto
Industrial park water infrastructure
Industrial park water infrastructure
72h Pump Test

continuous pumping test proving sustained industrial yield — the standard separating production boreholes from community supply wells.

Pump test in progress — yield certification
Pump test in progress — yield certification
Client & Partners

Supplying Ethiopia's industrial parks with water

Industrial Park Development Corporation

State-owned development corporation responsible for planning, developing and managing Ethiopia's industrial parks — primary client for the Shimela and Kilinto production borehole programme.

Client

Addis Ababa Water & Sewage Authority

Municipal water authority for Addis Ababa — co-ordinating the integration of the new production boreholes with the existing urban water supply network on the eastern outskirts of the city.

Co-ordinator

Orchid Business Group PLC

Ethiopia's specialist water well drilling contractor, executing production borehole drilling, 72-hour pump testing, water quality analysis and pump system installation at Shimela and Kilinto industrial parks.

Drilling Contractor
Have a project in mind?

Let's build something
remarkable together.

From feasibility through final handover — Orchid Business Group brings the machines, the manpower and the mastery.

Chat with us!