Pile Foundation Rail Infrastructure Completed

Awash–Kombolcha Railway Piling Works

Bored pile foundations for bridge substructures and structures along the Awash–Kombolcha–Hara Gebeya standard-gauge railway — OBG's largest single piling programme by number of pile locations.

Railway Piling
Bridge Foundations
ERC Corridor
2016–2019 Duration
Project Overview

Foundation piling for Ethiopia's expanding national rail network

The Awash–Kombolcha–Hara Gebeya railway extends Ethiopia's standard-gauge rail network northward from the Awash junction through the Afar lowlands and up into the Amhara highlands — a route requiring numerous river crossings and valley crossings demanding properly engineered pile foundations for bridge structures.

Orchid Business Group was engaged as piling sub-contractor to deliver bored cast-in-situ pile foundations for bridge abutments, pier foundations and other structural elements along the corridor. The work spanned two contrasting geological environments — the flat, soft alluvial soils of the Afar corridor and the harder basaltic rock of the Amhara highland sections — requiring Orchid's Bauer rigs to adapt drilling method continuously along the route.

The scope represented Orchid's largest piling programme by number of pile locations on a single project — demanding systematic rig movement planning, continuous casing inventory management and coordinated quality documentation to keep pace with the main contractor's bridge construction programme.

"Railway bridge piling demands precision at every pile head — tolerances tighter than building piling, because the bearing capacity under each bridge pier carries a dynamic load from trains crossing at speed."
— OBG Geotechnical Engineer
Scope of Work

Bridge foundations across a 400 km active corridor.

Each bridge location demanded its own site setup, access works and rig positioning sequence — multiplied across the full length of the Awash–Kombolcha–Hara Gebeya corridor.

Awash–Kombolcha railway corridor — bridge pile works
01

Bridge Abutment & Pier Piling

Systematic installation of bored cast-in-situ piles for bridge abutments and pier foundations across multiple water crossings along the Awash–Kombolcha corridor — each pile drilled to bearing stratum and concreted by tremie to structural engineer specification.

  • Multiple bridge locations
  • Abutment & pier piles
  • Varied diameter per bridge design
  • As-built survey per pile
River crossing access works and dewatering for railway piling
02

River Crossing & Difficult Access

Several bridge locations required piling over active river channels or through seasonally flooded ground — demanding temporary works, dewatering and access road construction before the Bauer rig could be positioned.

  • River channel access works
  • Temporary dewatering
  • Rig positioning to tolerance
  • Wet season planning
The Scale

OBG's largest piling programme by pile locations

Corridor
Awash–Kombolcha–Hara Gebeya
Multiple
Bridge pile locations
2019
Year completed
Bauer
Rig technology
The Challenge

Piling at speed across a 400 km active construction corridor

Rig Logistics

Moving a Bauer rig between multiple bridge locations across hundreds of kilometres of active construction corridor required detailed advance planning of routes, access, rig transport and site setup time.

Variable Ground

Afar alluvials, Amhara basalt and everything between them along the corridor — requiring the full range of Bauer drilling tools on each site visit.

Programme Interface

Each pile location was part of a bridge under construction by the main JV — meaning pile completion had to mesh precisely with the bridge contractor's formwork and rebar programme.

Our Approach

Fleet coordination, tool versatility and programme discipline

Two-Rig Deployment

Two Bauer BG-series rigs deployed simultaneously at different bridge locations along the corridor — maximising productive pile installation days against the main contractor programme.

Full Tool Kit

Each rig deployed with rotary auger, core barrel and DTH hammer — enabling the operator to switch technique at the pile face when geology changed without losing a shift.

Dedicated Scheduler

A full-time programme scheduler embedded in the OBG site team, tracking pile completion against bridge construction sequence and flagging clashes to the JV's planning team in advance.

Resources Deployed

Bauer precision across a railway corridor

OBG deployed a complete Bauer piling fleet from its own owned asset base — matched to the full range of geological conditions encountered along the corridor.

2 × Bauer BG-series Rigs

Deployed simultaneously at different bridge locations to maximise daily pile output across the corridor

Rock Core Barrel & DTH

Full drilling tool kit enabling method switching at the pile face — from soft alluvial to hard basalt without rig changes

Temporary Casing

Continuous casing inventory managed across the corridor, supporting both soft-ground and hard-rock pile locations

Tremie System

Underwater concreting capability for pile shafts at river crossing and dewatered locations

Survey Total Station

Pile position and verticality surveyed against tight railway bridge tolerances at every pile location

Rig Transport Low-beds

Dedicated low-bed trailers for rig movement between bridge locations across the active construction corridor

Orchid Bauer rig fleet deployed on Awash–Kombolcha railway piling
Two-rig deployment across the Awash–Kombolcha–Hara Gebeya corridor
Project Timeline

Sub-contract award through to corridor demobilisation

2016

Sub-contract Award & Mobilisation

Sub-contract awarded by Turkish/Chinese JV. Rig mobilisation, casing logistics, site access preparation and first bridge locations commenced.

2017–2018

Systematic Piling Across Corridor

Two-rig deployment advancing systematically through bridge locations along the corridor. Continuous adaptation of drilling method to varied Afar and Amhara geology. Programme tracking against JV bridge construction schedule.

2019

Final Locations, QC Sign-off & Demobilisation

Remaining bridge pile locations completed. Final as-built documentation and QC sign-off. Full rig demobilisation from corridor. Sub-contract formally closed.

Client & Partners

Delivering Ethiopia's rail infrastructure

Ethiopian Railways Corporation (ERC)

State-owned railway authority responsible for Ethiopia's standard-gauge rail network expansion programme, including the Awash–Kombolcha–Hara Gebeya corridor.

Project Owner

Turkish/Chinese Joint Venture

International joint venture appointed as main contractor for the Awash–Kombolcha–Hara Gebeya railway corridor — responsible for all civil works including bridge construction.

Main Contractor — OBG's Principal

Orchid Business Group PLC

Ethiopia's specialist piling contractor, engaged to deliver bored cast-in-situ pile foundations for bridge abutments, pier foundations and structures along the corridor.

Piling Sub-Contractor
Have a project in mind?

Let's build something
remarkable together.

From feasibility through final handover — Orchid Business Group brings the machines, the manpower and the mastery.

Chat with us!