Bored pile foundations for viaduct columns and station structures on the Addis Ababa Light Rail Transit system — Ethiopia's first urban railway and Orchid's first major piling project for a national transport infrastructure client.
The Addis Ababa Light Rail Transit system — the first urban rail transit system in sub-Saharan Africa — runs on elevated viaducts through central Addis Ababa. The viaduct structure demanded robust, well-designed bored pile foundations capable of carrying the dynamic loads of a continuous urban railway.
CREC (China Railway Engineering Corporation) was appointed as main contractor for the LRT construction. Orchid Business Group was engaged as piling sub-contractor to deliver bored cast-in-situ pile foundations for viaduct column bases and station structures along the corridor. Each pile was drilled through the varied geology of Addis Ababa — alluvial soils, weathered basalt and competent basaltic rock — requiring the flexibility of Orchid's Bauer rig capability to adapt to changing ground conditions along the route.
The Addis Ababa LRT project was an important proving ground for Orchid's pile foundation division — demonstrating that our Bauer-equipped team could deliver to the standards required by an international rail construction contractor in a complex urban environment, with active traffic management, restricted working hours and tight access constraints at each pile location.
"Pile foundations for an urban viaduct are among the most demanding pile contracts in terms of access constraints, noise management and quality documentation. Orchid delivered to the standard required."
— CREC Project Manager
Orchid's piling scope covered both the viaduct column foundations and the station structure foundations along the LRT corridor — each presenting different pile diameter, depth and access requirements.
Bored cast-in-situ pile foundations for LRT viaduct column bases — drilled through varied Addis Ababa geology to bearing stratum or rock socket, with reinforcement cage and tremie concrete placement to structural engineer specification.
Foundation piling for LRT station structures at designated stops along the corridor — larger diameter piles for the heavier column loads of station canopy and passenger infrastructure.
Images from the LRT pile installation works along the Addis Ababa LRT corridor — Bauer rig operations, casing installation and station foundation works in the urban environment.
Pile locations in live traffic corridors required careful access planning, lane closures and traffic management coordination with Addis Ababa city authorities.
Addis Ababa's subsurface varies sharply over short distances — from soft alluvial fills in valley bottoms to near-surface basalt on higher ground — requiring adaptive drilling techniques.
Chinese international contractor documentation standards required pile records, concrete cube certificates and survey data to be submitted within 24 hours of each pile completion.
Bauer rig equipped with both rotary bucket auger and core barrel to switch techniques at the pile face as geology changed — avoiding programme delays when rock was encountered unexpectedly.
Orchid's site team maintained active liaison with Addis Ababa Roads Authority and traffic police — obtaining lane closure permits in advance and co-ordinating work windows around peak traffic hours.
Dedicated pile recorder at every pile, completing CREC-format pile records in real time — enabling 24-hour submission compliance throughout the project.
Orchid's Bauer rig fleet and supporting equipment were configured specifically for the access constraints of the Addis Ababa LRT urban environment.
Bauer BG-series rotary drilling rig — the principal pile installation machine for all viaduct column and station piles along the corridor
Core barrel attachment enabling drilling through competent basalt rock where encountered along the variable Addis Ababa LRT geology
Oscillator-driven temporary steel casings for pile stability through soft soils and urban fill encountered in the upper pile length
Tremie tube concrete placement system ensuring void-free concrete fill from pile toe to cut-off level under all conditions
Electronic total station for precise pile positioning to CREC survey tolerances — every pile position independently verified before drilling
On-site cube sampling and curing for every pile concrete pour — supporting 24-hour certificate submission to CREC quality records
Sub-contract awarded by CREC. Bauer rig mobilisation to first pile location on the LRT corridor. Traffic management plan agreed with Addis Ababa Roads Authority.
Progressive pile installation advancing along both the East–West and North–South LRT lines. Viaduct column piles and station structure piles installed in coordination with CREC's overall LRT construction programme.
All piles installed and signed off to CREC quality records. Full as-built survey documentation submitted. Rig demobilisation. LRT system opened to public operation in September 2015.
State-owned railway authority responsible for the construction and operation of Ethiopia's national and urban rail network. ERC is the project owner and employer for the Addis Ababa LRT system.
Project OwnerOne of China's leading rail infrastructure contractors, appointed as main contractor by ERC for the design and construction of the Addis Ababa LRT system under a full EPC contract.
Main Contractor — Orchid's PrincipalEthiopia's specialist pile foundation contractor, engaged by CREC for bored cast-in-situ pile foundations for all viaduct column bases and station structure foundations along the LRT corridor.
Piling Sub-ContractorFrom feasibility through final handover — Orchid Business Group brings the machines, the manpower and the mastery.