Civils Active

Amibara Properties Blocks C & D Addis Ababa

Structural works for twin 2-basement+ground+26-storey residential towers — a contract valued at 504 million Ethiopian Birr and the largest single civil building contract in Orchid's history.

2B+G+26 Storeys
0 Contract value
0 Twin towers
Active Status
Project Overview

Rising above Addis — Orchid's most ambitious building project

Amibara Properties Blocks C and D represent the largest single building contract ever awarded to Orchid Business Group — twin residential towers of 2 basements, ground floor and 26 upper floors, rising above one of Addis Ababa's fastest-growing neighbourhoods.

Amibara Properties PLC selected Orchid as structural contractor based on our in-house rebar fabrication capability, integrated Bauer pile foundation access and track record of precision concrete construction. The 504 million ETB contract covers all structural works from basement excavation through to rooftop slab — delivering the structural shells of two identical towers simultaneously. In-house rebar cages are produced daily at the site's dedicated CNC bending facility, eliminating the supply chain risk that would otherwise compromise the frame construction programme.

"Selecting Orchid for Blocks C and D was a straightforward decision — in-house rebar, Bauer pile access and a team that understands high-rise concrete construction. We expect two towers that will stand for a century."
— Amibara Properties PLC
Scope of Work

Three work packages. Two towers. One milestone contract.

Orchid's structural scope covers every element from deep basement to rooftop slab — delivering two structurally identical towers simultaneously with the same site team and shared equipment.

Amibara Properties — twin tower construction
01

Twin Tower Structural RC Frame

Complete reinforced concrete structural works for two identical 2B+G+26 towers — basement to rooftop slab — including columns, beams, flat slabs, shear walls and staircase/lift core structures, delivered simultaneously.

  • 2 × (2B+G+26) RC frame
  • Column, beam & flat slab system
  • Shear wall & lift core construction
  • Target 5–7 day floor cycle
Basement excavation and foundation works
02

Basement Excavation & Foundation

Two-level basement excavation below street level with engineered temporary works, pile cap construction and raft foundation slabs — supported by Orchid's own Bauer rig for the tower foundation bored piles.

  • 2-basement excavation
  • Sheet pile retention system
  • Bauer bored pile foundations
  • Pile cap, raft & waterproofing
On-site rebar fabrication and formwork systems
03

Rebar Fabrication & Formwork

On-site CNC rebar cutting and bending facility producing all reinforcement cages for both towers — eliminating external supply risk. Engineered table-form and climbing formwork systems cycle between floors for consistent throughput.

  • On-site CNC rebar fabrication
  • Table-form floor cycling system
  • Climbing column formwork
  • On-site concrete batching
The Scale

Numbers that define a generation

504
M ETB
Contract value
OBG's largest building contract
28
floors
Per tower (G+26)
Plus 2 basement levels
2
towers
Identical structural specification
Rising simultaneously
2022–
Active since 2022
Frames currently rising
The Challenge

Managing a 504M ETB programme with two towers rising simultaneously

Programme Complexity

Two identical towers on independent programmes demand constant cross-team coordination — ensuring resources, formwork and rebar supply flow efficiently between both structures without one starving the other.

Basement Risk

Excavating two-level basements in central Addis Ababa requires careful management of groundwater, adjacent building surcharge and temporary works stability throughout.

Scale of Rebar

26-storey RC frames consume enormous quantities of reinforcement steel — maintaining in-house fabrication at the throughput required to keep both frame cycles moving is a significant daily logistics challenge.

Our Approach

Integration, in-house production and relentless cycle-time management

Dedicated Rebar Facility

A purpose-built on-site CNC rebar fabrication facility processes all reinforcement for both towers daily — ensuring cages conform to structural drawings and arrive on demand with zero external supply dependency.

Alternating Formwork Cycle

The table-form system rotates between floors on a 5–7 day cycle — maximising formwork utilisation by sequencing pour dates across both towers so the same equipment serves both structures.

Integrated Foundation Capability

Basement excavation supported by a driven sheet pile retention system, with Orchid's own Bauer rig handling the tower foundation piles below basement level — no sub-contractor required.

Project Timeline

From contract award to a rising Addis Ababa skyline

2022

Contract Award & Site Establishment

504M ETB contract signed. Site establishment, tower crane foundations, and on-site CNC rebar fabrication facility construction.

2023

Basement Excavation & Rebar Facility

Dual basement excavation with sheet pile temporary retention. CNC rebar facility commissioned and producing reinforcement cages daily on site.

2024

Foundation Piling & Sub-structure

Bauer bored pile installation for tower foundations. Pile cap and raft foundation slab construction. Sub-structure waterproofing and service penetrations complete.

2025–Present

RC Frame Construction — Frames Rising

Active RC frame construction on both towers. Columns, flat slabs and core walls progressing on the 5–7 day floor cycle. Both towers climbing towards completion.

Client & Partners

A direct relationship built on capability

Amibara Properties PLC

Private residential developer delivering landmark high-rise development in Addis Ababa. Selected Orchid directly for the Blocks C & D structural contract on the basis of in-house capability and track record.

Client & Developer

Orchid Business Group PLC

Ethiopia's leading infrastructure and construction contractor — delivering the full structural scope for both towers, including in-house rebar fabrication, integrated formwork systems and Bauer pile foundations.

Structural Contractor